The brief

A very complex build inside the factory, providing access to measure up new steel to be installed. This has been erected and dismantled within a 1-week shutdown. The job consists starting with two independents either side of the drier from the floor then sent over the top linking the two to create a birdcage, all standards had to be placed on load spreaders and land on load bearing points on top of the machine.